Working Records of the Company

 

Studies of entrance Junction of 4th Phase of Andisheh New city
Employer: Ministry of Road and Construction- Development Company of Andisheh New City 
Description of the performed works:

  • Performing surveying services and determination of UTM coordinates of junction
  • Performing design services of entrance grade intersection's rout of 4th phase
  • Designing the bridge's structure
  • Preparation of executive studies, calculation of objects, assessment in Rial and preparation of tender documents of the junction

Studies of Qeshm Central Highway from Dargahan to Qeshm airport
Employer: Qeshm Free Zone
Description of the performed works:

  • Conduction of traffic studies
  • Conduction of studies of the 1st phase of route
  • Conduction of geological and hydrological studies
  • Preparation of price list of executive costs

Studies of Jomhouri Interchange of Karaj
Employer: Karaj Municipality
Description of the performed works:

  • Conduction of studies of the 1st phase of geometric plan design of the junction
  • Conduction of studies of the 1st phase of junction's bridge structure

Studies of Javad Al Aemeh Square Interchange of Ahvaz
Employer: Ahvaz Municipality
Description of the performed works:

  • Conduction of studies of the 1st and 2nd phases bridge structure
  • Preparation of detailed estimations and evaluation of executive costs of junction's bridge structure

Studies of Imam Square Grade Intersection of Boroujerd City
Employer: Boroujerd Municipality
Description of the performed works:

  • Revision on 1st phase studies
  • Preparation of geometric plan before nailing

Studies of Boeen Zahra Interchange of Qazvin
Employer: Qazvin Municipality - Designing Services Organization 
Description of the performed works:

  • Revision on the studies of 1st phase of junction
  • Conduction of 2nd phase studies and preparation of geometric plan of junction
  • Carrying out surveying and nailing operations of junctions' ramps
  • Studies of junction's bridges structure
  • Preparation of executive details and assessment of executive costs in Rial

Studies of Bahonar-Beheshti Garde Seperated Intersection
Employer: Qazvin Municipality- Designing Services Organization 
Description of the performed works:

  • Revision on the studies of 1st phase
  • Conduction of 2nd phase of geometric plan of junction
  • Carrying out surveying and nailing operations
  • Studies of junction's bridges structure
  • Preparation of executive details and assessment 

Studies of Imam Ali Blvd. & Tehran-Zanjan Highway Interchange
Employer: Qazvin Municipality- Designing Services Organization 
Description of the performed works:

  • Revision on the studies of 1st phase of junction
  • Conduction of 2nd phase studies and preparation of geometric plan of junction
  • Carrying out surveying and nailing operations of junctions' ramps
  • Studies of junction's bridges structure
  • Preparation of executive details and assessment of executive costs in Rial

Designing Foundations of Railway in Khalij Fars Junction
Employer: Qazvin Municipality- Designing Services Organization 
Description of the performed works:

  • Analyzing and designing project structure
  • Preparing structural executive plans
  • Preparation of technical specifications
  • Estimating operations execution costs

Geometric plan and widening plan of Mizooj road
Employer: Qazvin Municipality- Designing Services Organization 
Description of the performed works:

  • Identifying the current status, primary examination and information analysis
  • Preparation of the approved first phase
  • Preparation of cost evaluation of operations

Studies of entrance Junction of 4th Phase of Andisheh New city
Employer: Ministry of Road and Construction- Development Company of Andisheh New City 
Description of the performed works:

  • Rendering revision services of the first phase of route
  • Conducting studies of the first phase of grade intersection structure
  • Conducting studies and designing of the 2nd phase of the junction's bridge
  • Preparation of executive plans, calculation of volumes, assessment in Rial and preparation of tender's documents concerning the junction

First and second Phase studies of civil and structure of Bushehr Azadi square Grade Separated Intersection
Employer: Bushehr Municipality
Description of the performed works:

  • Primary studies of bridges include general dimensions of the bridge, structural system, type and specifications of consumables, et cetera
  • Providing guidelines for conducting geotechnical tests and traffic diversion
  • Studies of the second phase of the structure
  • Providing inspection and maintenance instructions for the bridge
  • Cost estimation of the executing operations and tender documents

Site plan Studies of Qom Auto Mall Tourism Complex
Employer: Tourism Development Company of Tehran Ofogh Parsis
Description of the performed works:

  • Carrying out studies on technical and economic justification
  • Field studies and preparation of regional social and economic information
  • Providing acceptable options according to the needs metering
  • Preparation of site plan for land use plans

The geometric design of entering and leaving ramp of Qazvin - Zanjan Freeway and the access road to the landing site of soil and debris
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Identifying the status quo, initial review and analysis of information
  • Providing an option phase plan
  • Preparation of plan implementation plans, longitudinal and transverse profiles and executive documents
  • Cost estimation of the implementing operation

Borujerd  Zagros Hotel Pool and hall development design
Employer: Touring & Automobile Club of the Islamic Republic of Iran
Description of the performed works:

  • Reviewing and identifying the position and requirements of the plan
  • Providing physical planning and designation of internal user levels
  • Preparation of Phases One and Two, Phases of Architecture, Structures and Mechanical and Electrical Facilities
  • Cost estimation

Geometric design of Danesh Town Boulevard and Geometric and Structural Design of the Connected Bridge in the Communication Route of Danesh Town and Naserabad
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Identifying the status quo, initial review and analysis of information
  • Providing an option phase plan
  • Preparation of the implementation plans, longitudinal and transverse profiles and executive documents
  • Cost estimation of the implementing operation

Grade Separated Intersection, ramps and loops plan of the underpass subway of Phase 4 of Andisheh city
Employer: Ministry of Roads and Urban Development - Civil Engineering Company of Andisheh
Description of the performed works:

  • Carrying out a review of the studies and examining it with the design of the employer
  • Providing executive maps and relevant details
  • Carrying out traffic studies and plan for signs and strokes
  • Calculation of volumes, estimation of costs and preparation of intersecting bidding documents

Studies of the road of the Shahrestanak palace
Employer: Directorate of Cultural Heritage, Handicrafts and Tourism of Alborz Province
Description of the performed works:

  • Preparation of a topographic map on a scale of 1: 500
  • Preparing and plot longitudinal and transverse profiles
  • Providing route details
  • Calculation of volumes and inventory of executive costs

Study and design of the access road to the site of the Intermediate Waste Transfer Station
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Identifying the status quo, initial review and analysis of information
  • Preparation of plans and plans for the approved option
  • Providing appropriate scale maps
  • Providing a handbook on the cost of executing operations

Site Supervision of Bushehr Azadi Square Grade Separated Intersection
Employer: Bushehr Municipality
Description of the performed works:

  • Performing site supervision services on executive operation during construction in accordance with the relevant regulations and guidelines
  • Checking and confirming project timetable
  • Physical progress and primary contractor activities control to equip the workshop
  • Providing employer with consultation
  • Supervision and control over the supply of materials and determining their technical specification and order to conduct the necessary tests
  • Checking and confirming statements which are provided by contractor
  • Confirming technical and executive staff of contractor and supervision on their function
  • Providing employer with daily, weekly and monthly reports
  • Providing technical instruction and technical specification for executive operations
  • Checking meeting minutes and adopting it with executive drawings and technical instruction
  • Performed work control and adopting it with executive drawings and technical instruction
  • Quality control of the operations and fitness of machines working with the timetable
  • Pursuing the necessary tests and evaluating their results and et cetera.

The study of the central highway of Qeshm between Dargahan and Qeshm Airport
Employer: Qeshm Free Zone
Description of the performed works:

  • Collection of implemented, ongoing and future information in the area
  • Collecting and review existing traffic statistics and anticipate them in the future
  • Study on the geologic and hydrological of crossing area
  • Carrying out second phase studies and prepare executive plans
  • Providing a list of executive expenses

Road Safety Inspection Studies on Shiraz-Isfahan Freeway Part 3
Employer: Iran Construction and Civil Engineering Company
Description of the performed works:

  • Combination of project implementation maps
  • Inspection of safety of intersections and exchanges
  • Access control, vertical marks and signage
  • Control of longitudinal and transverse profiles and slopes
  • Providing technical inspection reports and obtain approval from the Deputy Director of Freeway Construction and Development

Fitting studies and geometric correction of Ferdowsi Square to the intersection of Imam Khomeini in Takestan
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Collecting information, conducting basic studies and reviewing the status quo
  • Mapping and first phase studies
  • Performing Phase II studies and providing appropriate scale and complete measurements
  • Cost estimation of the implementing of operation
  • Setting up document submission and study maps

Designing the Access Route for Mashaldar and Piriyousofian Discontinued Areas to Qazvin - Boyin Zahra Road
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Surveying the status quo
  • Collecting information and conduct basic studies
  • Information analysis and problem solving
  • Performing first phase studies
  • Performing second phase studies

Cross-pass design for safe pedestrian crossings on Motahari Blvd in front of the new municipality building
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Social study and assessment
  • Economic Study and Assessment
  • Collect information and conduct basic studies
  • Studying the status quo
  • Perform Phase One and Two studies
  • Cost estimation of the operation implementation

Designing the access road for separated segments of East and West Great Prophet Boulevard of Qazvin
Employer: Qazvin Municipality - Design Services Organization
Description of the performed works:

  • Performing zero phase studies
  • Performing first phase studies and providing executive guidance
  • Performing second phase studies and preparing plans and executive plans
  • Providing documentation and report of second phase

Superior Supervisory -Consultancy of Shah- Jamal Imamzade Camping Workshop
Employer: Directorate of Cultural Heritage, Handicrafts and Tourism of Qom Province
Description of the performed works:

  • Carrying out detailed studies and design of camping grounds and buildings
  • Conducting high-level supervision over the implementation of the project
  • Performing site supervision services during implementation

Detailed studies of type (3) Javanrood - Salas Babajani Road
Employer: Road and Urban Development Department of Kermanshah Province
Description of the performed works:

  • Investigating the corridor of the axis of the route and determine the bottlenecks
  • Providing possible variants for correcting the axis of the route
  • Preparation of the route corridor topography map
  • Performing second phase studies and prepare executive plans
  • Determining the status of canals
  • Determining the volumes and cost of executive operations

Consulting Services In the referral of development and supplementary services of Grade Separated Intersection, ramps and loops plan of phase 4
Employer: Ministry of Roads and Urban Development - Civil Engineering Company of new Andisheh city
Description of the performed works:

  • Designing and presenting of executive plans for walls and covering structures
  • Promotion of the project line of shahriar entrance ramp and the exit ramp of Andisheh to Karaj
  • Determining volumes and excavation and embankment values
  • Cost Estimation of wall and covering construction

Detailed studies of 4-B section of Esfarayn-Bojnourd railway road
Employer: Ministry of Roads and Urban Development - Construction and Development Company of Transportation Infrastructure of the Country
Description of the performed works:

  • Corridor review of the first phase studies
  • Data collection and administrative coordination
  • Conducting road design studies
  • Sustainable studies of long trenches and embankments
  • Bridges studies
  • Hydrology and surface water studies
  • Geological studies
  • Tunnel and geotechnical studies
  • Providing executive plans
  • Determining the amount and cost of executive costs
  • Providing bidding documents and designer schedules

Takam three-way intersection studies located at Sari-Takam road and Tajan River bridge
Employer: Ministry of Roads and Urban Development - General Directorate of Engineering and Design of Roads
Description of the performed works:

  • Reviewing the intersection and second-pass alternatives of the Sari-Kiasar road
  • Estimating the amounts and costs of implementation
  • Providing a report on the first phase of communication studies
  • Carrying out the first phase studies of the intersection bridge and the Tajan river bridge
  • Carrying out second stage studies and preparing civil and structural executive Plans
  • Determining the volumes and estimation of the executive costs and the preparation of the price list

Grade Separated Intersection of shohadaye-e-Gomnam in Khorramshahr
Employer: Ati Parsian Road Consulting Co.

Description of the performed works:

  • Checking the civil Interchange options
  • Exploring the structural options of the intersection bridges
  • Estimating the amounts and costs of the civil and structural options
  • Preparation of civil and structural studies first stage studies report
  • Carrying out second phase studies and preparing civil and structural executive maps
  • Determining the volumes and cost of the implementation and the preparation of the price list

Improvement of existing road of Qeshm – Ba Saeido airport
Employer: Qeshm Free Zone Organization
Description of the performed works:

  • Conducting traffic and hydrology studies
  • Preparation of the first phase studies report
  • Carrying out second phase studies and drawing up executive plans
  • Determining the scope and the cost of the implementation and the preparation of the price list

Sabz Railway station studies
Employer: The Headquarter Railways of The Islamic Repulic of Iran – Administration of Station Services
Description of the performed works:

  • Needs assessment and feasibility of Sabz Railway station
  • Development plan of Sabz station
  • Grading guide of Sabz station
  • Studies summarizing and documenting

Superior supervisory consultancy services and site supervision of completion of Imamzadeh Gharib Qom construction
Employer: Directorate of Cultural Heritage, Handicrafts and Tourism of Qom Province
Description of the performed works:

  • Performing studies and detailed design of constructions and campus
  • Performing superior supervision during plan implementation
  • Site supervision services during plan implementation

Superior and site supervision on implementation of rehabilitation operations of the main road of Javanrood - Salas Babajani
Employer: Employer: Road and Urban Development Department of Kermanshah Province
Description of the performed works:

  • Executive operations surveying control of contractor
  • Executive operations control of buildings and road bedding
  • Pavement specification control which is performed by contractor
  • Provide appropriate executive solutions
  • Problems review and providing necessary variants for removal of obstacles
  • Contractor's materials and machineries control
  • Timetable and executive operations control

Superior supervisory consultancy services and site supervision of landscaping of Qom's custom rail master plan project
Employer: Customs Administration of Qom Province
Description of the performed works:

  • Surveying status quo
  • Preparation of executive plans
  • Preparation of executive costs estimation and all tender documents
  • Performing superior supervision during executive operations
  • Performing site supervision services during executive operations

First and second phase studies of Vanak – Soulaghan road
Employer: Road Maintenance & Transportation Organization of Chaharmahal and Bakhtiari Province
Description of the performed works:

  • Statistics and information gathering
  • Future terrific estimation and reviewing The status of the transport network of the region
  • Identifying possible corridors for crossing the path and providing the desired variants
  • Performing geological studies
  • Hydrological and hydraulic studies
  • Executive plans preparation
  • Providing timetable and executive costs estimation